
Discover how modern BIM reduces typical metro viaduct design iterations from 20+ to under 5. Download the definitive guide for bridge engineering in India and Southeast Asia.
Fill out the form and get immediate access
Learn how to model for seismic shocks, monsoon scour dynamics, and 250 km/h cyclone winds using advanced nonlinear analysis.
Move from sequential handoffs to real-time collaboration. Resolve geometric and 4D temporal clashes before the concrete pours.
Leverage parametric design to optimize materials, extending service life by up to 20 years while cutting embodied carbon.
60%
Reduction in coordination errors achieved on the landmark Mumbai Trans Harbour Link project
90%
Reduction in fabrication time through robotic integration and factory-fabricated designs
40%
Potential reduction in embodied carbon compared to standard specifications through BIM-optimized material selection
“To achieve full BIM, the analysis model and the BIM model need to be connected. In many cases, the analysis is conducted using a simplified version of the deck. But that simplified model can’t be used for actual construction and that disconnect becomes a major issue.”
— Gabriel Neves, Technical Manager for Bridges | Trimble
For governments and contractors, BIM provides a decisive competitive edge in securing landmark infrastructure projects. Don't be left behind in the 2D era.
Terms of Use Privacy Statement Trademark Information Do Not Sell My Personal Information ©2026, Trimble Inc. and Affiliates